日韩精品一区二区亚洲AV观看,楼着胸摸娇喘的小黄文,2020亚洲色噜噜狠狠网站,全黄H全肉细节文玩雏女,亚洲 日韩 色 图网站,性欧美video另类hd尤物,无码爽大片日本无码AAA特黄,日本一区二区在免费,久久国产精品人妻无码,国产精品一区二区三区

全國(guó)服務(wù)熱線:

+86-25-89611918ext308

Grinding Roller Assembly

Publishdate:2021-06-07 Views:818


Product Code: 1.233658

Quantity: 3 pcs/set

Life of usage:4-7 years

Combination :shaft, hub, air seal, bearings, wear

segment, cover.

Function: Convey the pressure and grinding materials


Installation requirement: 

1, Combined grinding roller assembly and the

center yoke with bolts M80. The pressure of torque should be 2167KN.

2, Different hydraulic nut tools should be different pressure, please

confirm before installation.

3, Stay bolts to be retightened to the correct torque level after 8hours

and again 24hours and again 72hours until the torque remains constant.

4, Please leave the gap of bearings and seals at 0.5-1.0mm.


Replacement required standard:

 1, The bearings cannot run properly

2, The hub damaged when cannot afford to mount the wear segment.

3, To prevent the system of grinding from damage, which should be always

keep grease and lubrication running well

4, Check the air sealings on agenda and replace if necessary.


Product Code: 1.233658

Quantity: 3 pcs/set

Life of usage:4-7 years

Combination :shaft, hub, air seal, bearings, wear

segment, cover.

Function: Convey the pressure and grinding materials


Installation requirement: 

1, Combined grinding roller assembly and the

center yoke with bolts M80. The pressure of torque should be 2167KN.

2, Different hydraulic nut tools should be different pressure, please

confirm before installation.

3, Stay bolts to be retightened to the correct torque level after 8hours

and again 24hours and again 72hours until the torque remains constant.

4, Please leave the gap of bearings and seals at 0.5-1.0mm.


Replacement required standard:

 1, The bearings cannot run properly

2, The hub damaged when cannot afford to mount the wear segment.

3, To prevent the system of grinding from damage, which should be always

keep grease and lubrication running well

4, Check the air sealings on agenda and replace if necessary.