日韩精品一区二区亚洲AV观看,楼着胸摸娇喘的小黄文,2020亚洲色噜噜狠狠网站,全黄H全肉细节文玩雏女,亚洲 日韩 色 图网站,性欧美video另类hd尤物,无码爽大片日本无码AAA特黄,日本一区二区在免费,久久国产精品人妻无码,国产精品一区二区三区

全國(guó)服務(wù)熱線:

+86-25-89611918ext308

Grinding System Upgrade

Publishdate:2021-05-26 Views:1183

Change the nozzle ring and air flow system in mill house project.



The story belowed is one of the most successful project reference.

Clinker depot in additional project reference in Guizhou Province.



New additional clinker depot built in Guizhou cement

Reason analysis:

1, There are two set diameter15000*42000 clinkers depot whose capacity is 16000 tons,only can store 5days-6days production

2, It cannot satisfy the storage when the rainy season period comes or stoppage capacity requirement.

3, Full storage makes kiln stoppage which will cause extra expense or electricity costly.

Solution:

Add a new clinker depot at sizeΦ50000*42000 with steel whose capacity is 45000 m3 that can keep 60000 tons. It designed with steel coupled with conveyor and dust collector combined with previous ones,which can attain to 76000 tons capacity to guarantee to lengthen 25 days stoppage requirement.


Upgrading benefit analysis:

1, The capacity enlarged which can reduce the stoppage risky at least twice per year.

2,The capacity improved 6000tons which save the waste of kiln stoppage and earn profit of production enlarged.

3,Less investment which can earn back in 22 months

2,Kiln retrofit and modernization.

Kiln retrofit and modernization.

Background of kiln

1, The production of kiln of this line is 2500tons per day established in 2010

2 ,The production is not reliable between 2900 and 3000 tons because of the shortage of design,and the stringency of clinker is only 55MPA

3, Large consumption of coal at rate of 114-116kg/ton which costly a lot

4,Ammonia water consumption is high at rate of 3kg,(emission 260mg/m3)

Retrofit and modernization items:

1,Target in contract.

Production above 3100 t/d

Consumption of coal below 110kg/t-cl

ammonia water consumption less than 3kg when emission 200mg/m3

2,Methods

Lengthen the pipe of decomposing furnace,optimize the air system to reduce the obstruction pressure.

Air input optimized,change the position of third airflow input,replace the burner of decomposing furnace to reduce the emission of NOX.

Replace the new smoking house

Change the nozzle ring and air flow system in mill house project.



The story belowed is one of the most successful project reference.

Clinker depot in additional project reference in Guizhou Province.



New additional clinker depot built in Guizhou cement

Reason analysis:

1, There are two set diameter15000*42000 clinkers depot whose capacity is 16000 tons,only can store 5days-6days production

2, It cannot satisfy the storage when the rainy season period comes or stoppage capacity requirement.

3, Full storage makes kiln stoppage which will cause extra expense or electricity costly.

Solution:

Add a new clinker depot at sizeΦ50000*42000 with steel whose capacity is 45000 m3 that can keep 60000 tons. It designed with steel coupled with conveyor and dust collector combined with previous ones,which can attain to 76000 tons capacity to guarantee to lengthen 25 days stoppage requirement.


Upgrading benefit analysis:

1, The capacity enlarged which can reduce the stoppage risky at least twice per year.

2,The capacity improved 6000tons which save the waste of kiln stoppage and earn profit of production enlarged.

3,Less investment which can earn back in 22 months

2,Kiln retrofit and modernization.

Kiln retrofit and modernization.

Background of kiln

1, The production of kiln of this line is 2500tons per day established in 2010

2 ,The production is not reliable between 2900 and 3000 tons because of the shortage of design,and the stringency of clinker is only 55MPA

3, Large consumption of coal at rate of 114-116kg/ton which costly a lot

4,Ammonia water consumption is high at rate of 3kg,(emission 260mg/m3)

Retrofit and modernization items:

1,Target in contract.

Production above 3100 t/d

Consumption of coal below 110kg/t-cl

ammonia water consumption less than 3kg when emission 200mg/m3

2,Methods

Lengthen the pipe of decomposing furnace,optimize the air system to reduce the obstruction pressure.

Air input optimized,change the position of third airflow input,replace the burner of decomposing furnace to reduce the emission of NOX.

Replace the new smoking house